Thinking about adding an ADU in Central Oregon? This guide shows why hiring a knowledgeable, local design-build contractor is key to navigating zoning, maximizing rental income, and avoiding costly missteps—especially if you opt for a garage conversion, the fastest and most budget-friendly path to added space and passive income.

Thinking about adding an ADU to your property in Bend or Awbrey Butte? The first question most folks ask is: What does the ADU contractor actually do—and how do I know I’ve picked the right one?
Here’s the straight answer.
A great ADU contractor doesn’t just build small homes. They quarterback the whole process—from pulling your first permit to the final walk-through. And trust me, in places like Deschutes County and the city of Bend, where zoning and permitting can get a little sticky, picking the right partner is everything.
An ADU (Accessory Dwelling Unit) is a standalone or attached residential unit located on the same lot as your main home. They come in different flavors:
In short, if someone can live in it full-time—kitchen, bath, sleeping area—it could be an ADU.
Here’s what’s great in Central Oregon: cities like Bend and Redmond are actively encouraging ADUs to combat the housing crunch. Recent laws have made it easier—and faster—to get your project approved.
A few things to know:
The big takeaway? If your lot meets basic requirements, chances are you’re allowed to build.

Plenty of companies claim they can “do ADUs.” But navigating real Bend zoning laws and building codes is not something you learn from a YouTube video.
Here’s what a legit ADU contractor (especially a design-build team) handles for you:
I’ve seen neighbors go it alone, thinking they’d save money. Two years and three permit denials later, they hadn’t broken ground. Meanwhile, we finished an ADU in the same neighborhood in about eight months—with renters moved in the same week.
So yeah—hire someone who knows this region inside and out.
From the first consultation to completion, most ADUs take around 6 to 12 months. Yes, that includes permitting. Yes, that includes construction. Yes, that’s realistic—if your contractor isn’t overpromising.
Here’s how a typical ADU project flows:
Ballpark pricing?
Here’s what we’re seeing right now:
In other words: the tide is coming in. And the early builders are reaping the returns.
So you want an ADU in Awbrey Butte—but you’re not psyched about pouring a new foundation or laying utility lines. Here’s a move I’ve personally seen pay off over and over: go for a garage conversion.
Let me give you the inside scoop.
Most people aren’t even using their garage for their car. It’s a catchall for camping gear, old furniture, and bikes with flat tires.
Instead of letting all that square footage go to waste, you can turn it into a long-term rental, a guest suite, or a place for extended family to stay. And it’s faster and cheaper than a scratch-built unit.

Here’s why it works:
Plus, many garages in Central Oregon already have access to electrical and sewer lines nearby, which makes utility upgrades much easier (and cheaper).
Personal tip from experience: A few years ago, we converted a two-car garage in Redmond into a 480-square-foot ADU for around $130K all-in. The owner now rents it out full-time for $1,600/month. They basically covered their mortgage payment with a former junk-storage space.
Of course, not every garage can magically become a cozy, rentable apartment.
Here’s what may come up:
Also, just because it’s a garage doesn’t mean you get to skip permits. You’ll still need to go through Deschutes County or the City of Bend, depending on your address.
Some key details they’ll look for:
Want a quick shortcut? Design-build firms like ours take care of all these steps at once. We assess your garage, figure out what it’ll take, work up a permitted plan, and execute the build under one roof.
So now you’re probably asking the most important question of all: Is building an ADU—even a converted garage—actually worth it in Central Oregon?
Let’s look honestly at the numbers, the risks, and the potential.
(And we’ll dive into that, starting with rental income and financing, next…)
Before swinging a hammer or filing a permit, let’s answer the golden question: Will an ADU in Awbrey Butte actually pay you back?
In most cases, yeah—if it’s done right.
Here’s the quick and dirty financial play.
Typical monthly rent for a garage-converted or small detached ADU in Bend hovers between $1,400 and $2,200.
Higher-end units with great finishes and views—especially on Awbrey Butte—can fetch even more.
Let’s say you spend $165,000 on a well-executed garage ADU.
Even if you rent it for $1,600/month, that’s over $19K a year in rental income.
Factor out expenses, and you’re still clearing enough to offset a portion—or all—of your mortgage.
And this isn’t theory.
One of our projects near Shevlin Park—a converted detached structure—brought in $1,900/month from the first week it hit the rental market.
The owner already had applicants before we finished painting the front door.

Here's the real kicker: that same property appreciated by over $110K according to a licensed local appraisal six months after completion.
So yes, the numbers can work—especially here in Bend.
And that’s not including:
Not sitting on $200K in cash?
Most of our clients use one of these strategies:
Important to note: banks love resale-ready homes with income potential.
You’re not just asking for a loan—you're improving your collateral.
Pro tip: Work with a contractor used to coordinating with lenders. We’ve streamlined more than a few ADU builds by aligning scope of work with lender requirements up front—saving clients weeks of back-and-forth.

Not everything about adding an ADU is sunshine and passive income.
Here’s the stuff that trips homeowners up most often—and how to avoid it.
Spoiler alert: ADUs aren’t a trend—they’re the new normal.
Oregon is doubling down on middle housing and pushing for higher residential density across cities.
Here’s what that means if you’re considering a new build or garage conversion in places like Awbrey Butte or Northwest Crossing:
According to data from the City of Bend, ADU permit applications increased 22% last year.
That momentum? It’s not slowing down.
Premium neighborhoods like Awbrey Butte are seeing more inquiries for high-end ADUs—even with higher build costs—because they add livable square footage without the need to move.
Expect interest from:
If you’re still reading, here’s what I want you to remember.
Building an ADU—or converting your garage—isn’t just a remodel.
It’s a smart, strategic step toward financial flexibility on your own land.
But only if you do it right.
Hire local. Work with pros who know what works—from foundation code to tenant privacy to ADU-friendly layouts that attract renters.
Don’t risk the next few years of permits and headaches because you wanted to save 5% up front.
Give us a call. We’ll assess your property, give you a realistic number, and map out what it really takes—not just to build—but to profit.
You don’t have to DIY your way through something this important.
We’re DCR Northwest—custom renovation experts and design-build ADU contractors serving Awbrey Butte, Northwest Crossing, Sisters, Redmond, and the greater Bend area.
Call us at 541-699-2502 or shoot an email to matt@dcrnorthwest.com.
Start renting smarter, living freer, and building equity with your own accessory dwelling unit contractor.